2026Edition · Revision 2.1 · Electrical & Power
Lithium & DC System Record PDFConfiguration, Commissioning & Cell Balance Log
Transcribe your own cell and BMS figures, then track spread, pack-versus-sum and temperature over sixteen entries. 6 worked models. Fillable or Pencil & Print.
Free sampleReal pages of the Marine Diesel Baseline & Trend Log, fillable, no email needed. Download US Letter · A4
One payment. Yours to keep.Free sampleDiesel Log pages, no email: US Letter · A4
- Instant download
- Fillable or Pencil & Print
- Works offline
- Links never expire
Instant download. You can change your mind within 14 days of your order for a full refund. After that, we do not refund a change of mind. A file that is faulty or not as described is always replaced or refunded. Refund policy
Cell balance & pack trend
At the top of a charge, rested, charge sources off · example entries
| Date | SoC | Spread mV | Temp max °C |
|---|---|---|---|
| 02 May | 100 % | 8 | 21 |
| 14 Jun | 100 % | 9 | 26 |
| 30 Jul | 100 % | 11 | 27 |
| 10 Sep | 100 % | 14 | 23 |
- pages
- 37
- live fields
- 620
- models
- 6
- Letter, both included
- A4 + US
Look before you buy
Real pages of the delivered PDF, Revision 2.1. Open a page to read it full size.
The page, blank As delivered
Page 19 of 37 as delivered; printed example row, invented figures.
Cell balance & pack trendOpen page 19
The page, filled Example
The first four lines, example entries; Acrobat Reader calculates the rest.
Not a real boatOpen the filled page
Replaced or refunded Section 3
If a file
- will not download
- will not open
- is corrupt
- is missing pages
- does not contain what this store said it contains
Email us your order number and a short description. We look into it and, at your choice, supply a working file or refund you in full.
Faulty or not as described: a working file or full refund.
No time limitRead section 3
Your next step
Everything in order before you start.
- Instant download
- Working file or full refund
Instant download. You can change your mind within 14 days of your order for a full refund. After that, we do not refund a change of mind. A file that is faulty or not as described is always replaced or refunded. Refund policy
Technical specification
- Size
- 37 pages, 620 fields, 6 models
- Formats
- Fillable and Pencil & Print, each in A4 and US Letter
- Calculated in
- Adobe Acrobat Reader on computer, iPhone and Android
- Delivery
- Instant download, links never expire, no account needed
For the careful buyer
Read it all before you decide
7 sections · about 6 minutes · the full brief, nothing held back
01In shortThe cell spread is the most useful number in a lithium bank, and no dashboard shows it to you. Your monitor shows…2 min
The cell spread is the most useful number in a lithium bank, and no dashboard shows it to you.
Your monitor shows a state of charge and a pack voltage. Both look healthy right up to the day one cell drifts away from the others and the BMS starts disconnecting under load. The gap between your highest and lowest cell, read at the top of a charge where imbalance is widest, is the number this record keeps, so a change is on paper long before anyone has to explain a disconnect.
This record holds that number over time, alongside the configuration it belongs to: what cells, what BMS, what fuse, what each charge source is actually set to, and who signed the installation off.
What you receive
Commissioned once, balanced for the life of the bank, in two editions
- A 24-line reference page for the cell, BMS, charger and inverter figures you transcribe, with the source and page beside each
- A 20-line as-installed record covering fuse, disconnect, cable sizes, sensor positions, and what every charge source is actually set to
- Per-cell commissioning readings for up to sixteen cells in series, with the meter recorded
- 16 balance entries tracking cell spread, pack-versus-sum and temperature over time
- A BMS event register including the warnings that cleared themselves
- 6 calculation models for spread, connection loss, deviation, inverter surge current, delivered capacity and equivalent cycles, each with a worked example
- A charge source verification page, a balance chart, a deviation sheet and an electrician brief, so the gap between programmed and delivered is written down and every drift ends as a precise question for a qualified electrician
02The gap between the drawing and the boatPart I is what your documentation says.1 min
Part I is what your documentation says. Part II is what is actually fitted: the fuse body you read with a torch, the cable marking, the charger set point measured at the terminals rather than assumed from the menu. The gap between those two pages is the first thing a marine electrician will ask about, which is why both are written down here.
Model E2 sets the pack voltage beside the sum of the cells, read with the same meter at the same moment, with the current flowing at that time written down. A difference that grows from one entry to the next, at a similar current, is recorded and taken to your electrician as a question about the links between the cells.
03Built to be filled in beside the bankIn the Fillable edition every line has a field, sized for a thumb rather than a stylus.1 min
In the Fillable edition every line has a field, sized for a thumb rather than a stylus. Type each cell voltage on day one; in Adobe Acrobat Reader, free on computer, iPhone and Android, the sum of the cells, the spread and the pack difference work themselves out, and every later balance entry shows how far the spread has moved since commissioning. The Pencil & Print edition is ruled for handwriting in GoodNotes or Notability, or on a clipboard in the locker. Both come in A4 and US Letter and work offline.
Not one published voltage. Deliberately.
Cell voltages, charge currents, balance thresholds and temperature cutoffs differ by chemistry, by cell maker, by BMS and by firmware revision. A charge voltage that is correct for one cell will damage another. A low-temperature lockout that is right for one chemistry permanently plates lithium onto the anodes of the next. So this record publishes none of them. You transcribe yours once, from the documentation that came with your own cells.
04Installation is qualified work. This is a record of it.No page here tells you to fit a fuse, torque a busbar, program a BMS, size a cable or wire a charge…1 min
No page here tells you to fit a fuse, torque a busbar, program a BMS, size a cable or wire a charge source. High-current DC work on a boat is governed by standards, it belongs to a qualified marine electrician, and a lithium bank is the one system aboard that can take the whole boat with it.
Part VI is sixteen lines recording that a competent person verified the installation, and who that person was, with their qualification and the date. Those are questions to put to your electrician, not a checklist for a Saturday afternoon.
05How you live aboard decides which page earns its keepThe owner who has just had the bank fitted.2 min
The owner who has just had the bank fitted. Commissioning readings, this month, while the cells are new and matched. A spread measured on a new bank is the reference every later reading is judged against, and it cannot be recovered afterwards. Get Part VI signed at the same time, while the electrician is still on the boat.
The liveaboard. The bank decides whether the boat is habitable in February, so the balance entries are your working page. Read at the top of a charge, always at the same point, and the spread is recorded the same way every time, so any change is written down before anyone has to explain a BMS disconnect.
The owner who inherited the installation. Part II before anything else, with a torch. What is actually fitted rarely matches what the previous owner described, and the charge source settings measured at the terminals are where the surprises live.
The coastal owner on shore power most of the year. Few cycles, so wear is slow, but a bank that sits at a high state of charge all winter is not resting. Equivalent cycles and the event register matter more for you than the trend, and they are quick to keep.
The owner facing a surveyor or an insurer. The verification page is the document they want, and it is the one almost nobody has. A qualification, a name and a date turn an installation from an assertion into a record.
06Technical specificationEvery figure, edition and format, in one table.1 min
| Product ID | AML-ELEC-2026-01 |
| Extent | 7 parts, 6 calculation models, 2 editions |
| Register lines | 128 across reference, as-installed, commissioning, trend, deviation, electrician brief and verification |
| Interactivity | Fillable edition: live PDF form fields, saved into the file; cell sum, spread, its growth since day one, deviations and models calculated in Adobe Acrobat Reader on computer, iPhone and Android. Pencil & Print edition ruled for handwriting. |
| Formats included | Fillable and Pencil & Print, each in A4 and US Letter |
| Which file to open | Fillable in Adobe Acrobat Reader or Apple Files; Pencil & Print in GoodNotes, Notability or on paper; A4 or US Letter by the paper you print on |
| Tested in | Adobe Acrobat Reader on Mac, iPhone and Android, Apple Files, GoodNotes, Notability |
| Systems | Any chemistry, up to 16 cells in series. No chemistry-specific data. |
| Units | Unit-neutral. You set them and record which you used. |
| Offline | No app, no account, no connection required once downloaded |
07What it is notThis document records, structures and compares figures that you supply.1 min
This document records, structures and compares figures that you supply. It publishes no voltage, no current limit, no temperature cutoff, no fuse rating and no torque figure, and it reaches no conclusion about any installation. It is not a wiring guide, not an integration manual and not engineering advice.
Those decisions belong to a qualified marine electrician working to the standards that apply where your vessel is flagged and used, and to the documentation supplied with your own cells. A lithium installation that is wrong does not fail gracefully.
Instant download. Your links appear on screen the moment payment clears, and a copy arrives by email, usually within a few minutes. They do not expire.
2026 Edition, Revision 2.1, AML-ELEC-2026-01. Apex Marine Labs designs the organisational process behind good seamanship. Our documents record and organise; they do not replace a certified marine survey, an installation standard, or a qualified marine electrician.
You already know what to check. What's missing is the order.
Walk aboard with a record, not a memory.
- Instant download
- Fillable or pencil
- Working file or full refund
- One payment, yours to keep
Instant download. You can change your mind within 14 days of your order for a full refund. After that, we do not refund a change of mind. A file that is faulty or not as described is always replaced or refunded. Refund policy
Questions
Before you buy the Lithium & DC System Record
The question owners ask most on this subject, then the five asked about every document, answered for this one.
Are lithium batteries safe on a boat?
That depends on the installation and on how every charge source is set, so no general answer covers your boat. Record what was fitted, each charger and alternator setting against the cell maker's documentation, and the spread between cells from day one. The installation itself belongs to a qualified marine electrician and to what your insurer accepts.
Which file do I open?
The download holds a one-page Start here and the document in two editions, each in A4 and US Letter. To type on a computer, iPhone or Android phone, open the Fillable edition in Adobe Acrobat Reader, which is free. To write by hand, open the Pencil & Print edition in GoodNotes or Notability, or print it.
Does it calculate on iPhone or Android?
Yes. In Adobe Acrobat Reader on iPhone or Android, the cell sum, the spread, its growth since day one and the deviations calculate as you type, as they do on a computer. Every entry is saved into the file itself: no app of ours, no account and no connection once downloaded.
What does it deliberately not contain?
Any voltage, current limit, temperature cutoff or fuse rating. Your figures come from your own cells' documentation, and installation decisions belong to a qualified marine electrician.
Does it suit a power boat?
Yes. Any boat with a DC system and any cell chemistry; the figures come from your own documentation.
A4 or US Letter?
Both, in both editions, in every purchase. Choose by the paper you print on: A4 in Australia, New Zealand and Europe, US Letter in the United States and Canada. The pages and fields are the same in each.
Before you start